Sale!

Hi Kiss 6ft 30ft 50ft 100ft 160ft 200feet Black Extra Long Line Training Dog Leash – For Large,Medium and Small Dogs – Long Lead – Great for Training, Play, Camping, or Backyard – 50FT

$15.00 $11.99

SKU: B075GFNJ28 Category: Tag:

Description

Built Strong
Nylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range is built with heavy duty materials that can withstand daily use over an extended period of time. It can be used with small and medium and large size dogs.

Sizing
6 Feet 10 Feet 30 Feet 50 Feet 100 Feet 200 Feet.

  • NYLON TRAINING LEAD – This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for small and medium and large dogs. You’ll love using it as a backyard dog leash, for off leash dog training, and more.
  • DIMENSIONS – This dog leash measures by 50 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
  • LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed.Allows you to teach your dog recalls and other obedience skills.
  • THICKENED HANDLE:Handle is made from advanced diving material, more comfortable and wearable
  • CHECK OUT ALL OF OUR TRAINING LEASHES – Click on the ZHIXUANKE link under the title to view all our popular training products.

Additional information

ProductGroup

Pet Products

ProductTypeName

PET_SUPPLIES

PartNumber

ZXK-DOGLEASH-0809-004

PackageQuantity

1

PackageDimensions
Publisher

Zhixuanke Network Technology Co Ltd

Size

50 FT

UPCList
UPC

606682801104

Title

Hi Kiss 6ft 30ft 50ft 100ft 160ft 200feet Black Extra Long Line Training Dog Leash – For Large,Medium and Small Dogs – Long Lead – Great for Training, Play, Camping, or Backyard – 50FT

Studio

Zhixuanke Network Technology Co Ltd

NumberOfItems

1

MPN

ZXK-DOGLEASH-0809-004

EANList
EAN

0606682801104

Color

Black

Brand

Hi Kiss

Feature

NYLON TRAINING LEAD – This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for small and medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more.

ItemDimensions
Model

SZZXK-DOGLEASH-20170809-001-04

Manufacturer

Zhixuanke Network Technology Co Ltd

ListPrice
Label

Zhixuanke Network Technology Co Ltd

Binding

Misc.